Starting from the top
Nut
Reb. - left it stock
21.3
24.3
26.3
28.3
30.3
32.3
34.3
24.1
7-34.2
piston
comp. stack
7-32.2 - this is the low speed stack
30.1 - crossover shims
25.1 - crossover shims
36.3 - beginning of high speed stack
34.3
32.3
30.3
28.3
25.3
22.3
19.3 - end of high speed stack. also know as the clamp shim. Very important. The smaller diameter it is the easier the rest of the shim can bend around it.
New comp stack
piston
7-38.2
25.1
34.3
32.3
30.3
28.3
25.3
22.3
19.3
17.3 New clamp
30.1 Removed from up top.
36.3 removed from up top.
done.
