
So, my bike was due for new swing arm bearings, so I tore into it to replace them. Well, my wife recently got an 07 CRF150RB, then shortly after a recluse clutch and flywheel weight for it. Then my oldest got his 01 KDX220, bone stock (but I'm working on that), and right after words my 3rd boy gets a brand new CRF110.....Then #2 get info that he also has a KDX220 waiting for him when he is ready.....


Bike get's tore down to parts, with the exception of the motor, which is still intact. Found a problem with my 93 KDX200 hubs, so new hubs where going to be needed....LUCKILY I scored some older KX, complete wheels, both for less than $60 shipped


That's my frame and rims sitting there. The paint should have been sprayed and baked today, so as soon as the swing arm and wheels get done, I'll pick them up.
Next step is to have the wheels reassembled with new spokes and we are going to "wrap" them in a black shrink tube. Then the bike gets bearing set, the forks off to the builder and everything slowly reassembled. I am about $100 into misc small parts needed for the frame and another $150 in other parts, like bearings, new number plates, new bolts for the side stand etc. I still need to get new bars, over sized bar mounts, levers, bark busters, a better, err, more preferred skid plate, tires (I swear that the tires that I want will NEVER be in stock) and other goodies.
I'll only mess with the motor IF OT at work keeps up for the next 6 weeks, or if other stuff comes in under budget. I'm thinking about an EG 225 kit and RB rebuilt carb for this bike. But that part is on the back burner as of right now. I figure, in just the cost of this rebuild (not including the bike itself), I will be into it about 2X what it will be worth. BUT, this should give me a "nice" bike to ride for a few more years.
I'll try to keep the thread updated as progress is made.

I hope to keep the posts and pictures current through the process.